Search Results

337 results found (0.01 seconds)
Result Item 261 to 270 of 337
APLNG RORO Protection

APLNG RORO Protection

MMA supplied scour protection system for the FLNE RoRo Ramp.

Rota Pipeline Crossing Sleepers

Rota Pipeline Crossing Sleepers

Allseas contracted MMA to design and fabricate two sleepers to place as new supports on either side...

OMV Maari Jacket Leg Repair

OMV Maari Jacket Leg Repair

MMA worked with the Client and Worley Parsons to deliver a high strength grouted connection between...

Motola Terminal Scour Protection

Motola Terminal Scour Protection

MMA was approached by Grindrod’s contractor Subtech to design and supply a scour system that...

Merimbula Engineered Reef

Merimbula Engineered Reef

MMA performed the design, construction and installation of 2 x 90te Fish Tower modules giving the...

Turkstream Dropped Object Culverts

Turkstream Dropped Object Culverts

MMA was contracted to design, engineer and fabricate ten (10) culverts to protect the pipeline from...

Amrun Dolphin Grouting

Amrun Dolphin Grouting

MMA designed an inflatable packer to seal the bottom of the jacket leg.

Chevron Wheatstone Annulus Plug

Chevron Wheatstone Annulus Plug

MMA's scope included design and qualification testing for a reversible plug.

Brighton Breakwater Remediation

Brighton Breakwater Remediation

MMA was awarded the full remedial scope for 23 caissons as part of the bi-annual maintenance...

Malampaya Pipe Clamping Mattress

Malampaya Pipe Clamping Mattress

MMA was awarded the full remedial scope for 23 caissons as part of the bi-annual maintenance...

Result Item 261 to 270 of 337