Search Results
337 results found (0.01 seconds)
MMA completed the grouting of the Wheatstone Trunkline into the shore crossing microtunnel in 2014.
To accommodate a new 170m long vessel, Citic Pacific required the port’s berthing pocket to...
McDermott was contracted with the design, procurement, fabrication, transportation and installation...
MMA's scope on this project was to develop the grouting procedure, selection of plant and equipment...
MMA was contracted for the design, supply and transport of concrete mattresses for scour protection...
MMA provided the equipment, materials and manpower to grout the clamps post installation.
MMA was contracted to design, supply and install a high performance freespan and stabilisation...
To reduce pipeline stresses, 4 grouted supports (2 at each touchdown point, on either side of the...
MMA lead the project with partners RecFishwest, WA Fisheries, NERA, BHP and Curtin University, to...
MMA was asked to supply patented artificial reef structures for installation offshore of Mauritius....