﻿<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><atom:link href="http://www.neptunems.com/rss/default.aspx?cid=326" rel="self" type="application/rss+xml" /><link>http://www.neptunems.com:8081/rss/default.aspx?cid=326</link><title>Mintox RSS Feed</title><description>News Feed</description><pubDate>Sat, 25 Apr 2026 17:21:02 GMT</pubDate><lastBuildDate>Sat, 25 Apr 2026 17:21:02 GMT</lastBuildDate><generator>Mintox</generator><item><title>Julimar Walking Mitigation</title><link>http://www.neptunems.com/our-experience/australasia/julimar-walking-mitigation</link><guid>http://www.neptunems.com/our-experience/australasia/julimar-walking-mitigation</guid><description><![CDATA[<img src="http://www.neptunems.com/theme/mmaoffshorecomau/assets/public/Image/project-thumbnails/julimar_walking_mitigation_thumbnail.png" alt="Julimar Walking Mitigation" /><p>MMA was awarded the full remedial scope for 23 caissons as part of the bi-annual maintenance program.</p>
]]></description><pubDate>Mon, 31 May 2021 16:00:00 GMT</pubDate></item><item><title>Subsea Valve System (SVS) for Life of Field Extension</title><link>http://www.neptunems.com/our-experience/subsea-valve-system-svs-for-life-of-field-extension</link><guid>http://www.neptunems.com/our-experience/subsea-valve-system-svs-for-life-of-field-extension</guid><description><![CDATA[<img src="http://www.neptunems.com/theme/mmaoffshorecomau/assets/public/Image/project-thumbnails/svs_thumbnail.png" alt="Subsea Valve System (SVS) for Life of Field Extension" /><p>MMA has developed an innovative Subsea Valve System (SVS) that reinstates the full functionality of the XT without having to refurbish or replace the XT and with significant reduced production down time.</p>
]]></description><pubDate>Sun, 09 Dec 2018 16:00:00 GMT</pubDate></item><item><title>Rota Pipeline Crossing Sleepers</title><link>http://www.neptunems.com/our-experience/rota-pipeline-crossing-sleepers</link><guid>http://www.neptunems.com/our-experience/rota-pipeline-crossing-sleepers</guid><description><![CDATA[<img src="http://www.neptunems.com/theme/mmaoffshorecomau/assets/public/Image/project-thumbnails/rota_web_thumbnail.png" alt="Rota Pipeline Crossing Sleepers" /><p>Allseas contracted MMA to design and fabricate two sleepers to place as new supports on either side of the Rota 2 pipeline.</p>
]]></description><pubDate>Tue, 02 Jan 2018 16:00:00 GMT</pubDate></item><item><title>Turkstream Dropped Object Culverts</title><link>http://www.neptunems.com/our-experience/turkstream-dropped-object-culverts</link><guid>http://www.neptunems.com/our-experience/turkstream-dropped-object-culverts</guid><description><![CDATA[<img src="http://www.neptunems.com/theme/mmaoffshorecomau/assets/public/Image/project-thumbnails/culverts_web_thumbnail.png" alt="Turkstream Dropped Object Culverts" /><p>MMA was contracted to design, engineer and fabricate ten (10) culverts to protect the pipeline from dropped objects.</p>
]]></description><pubDate>Sun, 31 Dec 2017 16:00:00 GMT</pubDate></item><item><title>OMV Maari Jacket Leg Repair</title><link>http://www.neptunems.com/our-experience/omv-maari-jacket-leg-repair</link><guid>http://www.neptunems.com/our-experience/omv-maari-jacket-leg-repair</guid><description><![CDATA[<img src="http://www.neptunems.com/theme/mmaoffshorecomau/assets/public/Image/project-thumbnails/omv_maari_web_thumbnail.png" alt="OMV Maari Jacket Leg Repair" /><p>MMA worked with the Client and Worley Parsons to deliver a high strength grouted connection between the jacket leg member and an internally placed mandrel.</p>
]]></description><pubDate>Mon, 02 Jan 2017 16:00:00 GMT</pubDate></item><item><title>Cape Preston Berth Pocket</title><link>http://www.neptunems.com/our-experience/cape-preston-berth-pocket</link><guid>http://www.neptunems.com/our-experience/cape-preston-berth-pocket</guid><description><![CDATA[<img src="http://www.neptunems.com/theme/mmaoffshorecomau/assets/public/Image/project-thumbnails/cape_preston_berth_pocket_website_thumbnail.png" alt="Cape Preston Berth Pocket" /><p>To accommodate a new 170m long vessel, Citic Pacific required the port&rsquo;s berthing pocket to be deepened from 10m to 11m.</p>
]]></description><pubDate>Sat, 31 Dec 2016 16:00:00 GMT</pubDate></item><item><title>Quad 204 - Wellhead Strengthening System</title><link>http://www.neptunems.com/our-experience/quad-204-wellhead-strengthening-system</link><guid>http://www.neptunems.com/our-experience/quad-204-wellhead-strengthening-system</guid><description><![CDATA[<img src="http://www.neptunems.com/theme/mmaoffshorecomau/assets/public/Image/project-thumbnails/quad_204_thumbnail.png" alt="Quad 204 - Wellhead Strengthening System" /><p>As part of their Schiehallion Quad 204 drilling campaign, BP employed a Generation-6 semi-submersible rig for the drilling operations.</p>
]]></description><pubDate>Thu, 12 May 2016 16:00:00 GMT</pubDate></item><item><title>Subsea Tree Actuator Valve Reinstatement System (PCOL System)</title><link>http://www.neptunems.com/our-experience/subsea-tree-actuator-valve-reinstatement-system-pcol-system</link><guid>http://www.neptunems.com/our-experience/subsea-tree-actuator-valve-reinstatement-system-pcol-system</guid><description><![CDATA[<img src="http://www.neptunems.com/theme/mmaoffshorecomau/assets/public/Image/project-thumbnails/subsea_tree_web_thumbnail.jpg" alt="Subsea Tree Actuator Valve Reinstatement System (PCOL System)" /><p>MMA engineered and manufactured the PCOL (Platform Controlled Override Linear) system as a permanent solution to overcome all the problems of temporary LAOT&rsquo;s.</p>
]]></description><pubDate>Tue, 12 May 2015 16:00:00 GMT</pubDate></item></channel></rss>